2010-04-16 / Front Page
Gate One Reopens
Gate One is scheduled to reopen to normal traffic flow beginning at 1 a.m., April 16 (Friday). Traffic flow is expected to be the same as before the onset of the Gate project.
Gate One is scheduled to reopen to normal traffic flow beginning at 1 a.m., April 16 (Friday). Traffic flow is expected to be the same as before the onset of the Gate project.